3D Printed Concrete - Universal Cost Calculator

Calculated Estimated & Should Include a 10-15% Margin

🏗️ Project Parameters

ℹ️ Note: Total Volume (m³) can be calculated from Length, Width, and Height, or entered manually. Project Duration is automatically calculated based on Total Volume, Daily Operating Hours **for Printer** (assuming 0.3 m³ material requires 1 hour for printing) AND **for Mixing** (assuming a 0.081 m³ /batch).

🔧 Sub Materials - Rebar (Integrated Calculation)

Total Rebar Weight

0 kg

Total Rebar Length

0 m

Total Rebar Cost

Rp 0

Total Bars (12m)

0 bars

📊 Rebar Calculation Details per Type

Joint Type Total Length (m) Diameter Number of Rows Overall Length (m) Weight (kg)

💰 Cost Breakdown per Rebar Diameter

💡 Rebar Calculation Notes:
  • Calculation is based on the **specific segment dimensions and number of segments** you input in this section, for on-site assembly.
  • This calculation **does NOT automatically scale with the overall "Total Volume (m³)"** of your project. If you manually adjust the project's "Total Volume" and need the rebar cost to reflect that scale, you must manually adjust the "Number of Segments" or other dimensions in this section.
  • Rebar is primarily for **segment joints** and tie structures.
  • Add **10% tolerance** for field adjustments.
  • Prepare **grooves/channels** on segments for rebar placement.
  • Ensure proper alignment before final grouting.

🖼️ Project Visualization

Upload an image for project visualization (JPG, PNG, GIF).
Project Image Preview
ℹ️ Note: Uploaded images will appear here. For printed reports, this image will be included.

📐 Detailed Printing Geometry (for Ink Cost & Volume Reference)

0 m
0 m³
Rp 0
ℹ️ Note: The "Total Volume (m³)" above is the main input for the overall project. Geometry parameters here are used for more detailed ink cost calculation and to provide an alternative volume estimate based on layer dimensions. **This Total Ink Extrusion Cost is for reference and NOT included in the project total.**

📚 Material Composition Reference Per Batch

Material Qty (Kg/L) Volume (m³) Cost
💡 Note: This table shows the composition of the **selected** material batch. Material costs in the "Raw Materials" section are calculated based on the project volume input you provide.

⚖️ Material Quantity Summary (Per Project)

Material Qty per m³ (from input) Total Quantity (Kg/Unit)
💡 Note: Total quantities are calculated based on your project volume. Use this to estimate logistics and procurement needs.

🖨️ 3D Printer Selection & Equipment Rental

Select Printer Brand & Rental Option:

Currently selected: None
💡 Rental Information: Prices include operator training and basic maintenance. Purchase options include a 5-year warranty and full technical support.

🧱 Raw Materials (Per Project Volume)

Material Description Qty per m³ (calculated) Price per Unit Use Total Cost
Ink Powder Cost: $600/ton (~9600 IDR/Kg) Kg/m³ IDR/Kg
Portland Cement Red Lion Brand Kg/m³ IDR/Kg
River Sand From Karangasem Kg/m³ IDR/Kg
Plastic/Tarpaulin 10% Unit/cost Unit/m³ IDR/Unit
Water Clean Water L/m³ IDR/L
Total Raw Materials per m³

🚚 Additional Equipment & Rentals

Equipment Description Duration (Unit) Unit Type Rate per Unit Use Total Cost
Distribution
Mobile Crane Hours
Truck Crane Hours
Truck Hours
Forklift Hours
Pickup Trip
Equipment
Concrete Mixer Rental (manual pour) Hours
Compressor Rental for Tools Hours
Angle Grinder Hours
Brushless Drill Unit
Miscellaneous Rentals & Consumables
Fuel & Power Consumption Hours
Equipment Subtotal

👷 Labor Costs

Position Description Quantity Time (Minutes/Day) Rate per Hour Use Total Cost
Field Worker 250K IDR / 8 Hours
OP Leader 500K IDR / 8 Hours
Mixing Crew Per Batch Mixing
Printer Operator Per Printer Operation
Daily Worker (Load/Unload) 200K IDR / 8 Hours
Total Labor Cost

💰 Cost per Cubic Meter (m³)

Rp 0

Total project volume: 0.00

📊 Project Cost Summary

Category Description Total Project Percentage
3D Printer Not Selected 0 0%
Equipment & Rentals Additional tools and equipment 0 0%
Raw Materials Concrete mix components 0 0%
Labor Workers and supervision 0 0%
Rebar Steel bars and accessories for segments 0 0%
TOTAL PROJECT 0 100%

📜 Calculation History

Your User ID: Loading...

Date Project Name Total Volume (m³) Cost per m³ Total Project Cost Details
Loading history...

💖 Support Our Work

If this calculator has been useful to you, please consider making a small donation to support its development and maintenance. Every contribution helps!

Thank You